Engineering Staff:
-
City Engineer: Holly Wilson
-
Clerical: Janell Sommers
-
Records/Construction Manager: Lynden
Wittman
-
Technician: Darrell Hoekstra
-
Survey Technician: Ryan Rausch
The City of Willmar consists of the following:
-
13.52 square miles or 8654.7 acres
-
121.8 miles of roads
-
7.9 miles of sanitary forcemains
-
51.8 miles of storm sewers
-
102.8 miles of watermains
Department facts:
-
Responsible for design; construction, inspections,
& management of city projects.
-
Maintain accurate records of projects completed
-
Provide information to the public regarding city
infrastructure
-
Engineering department is networked with other city
departments and is completely computerized
2012 Street Improvement List
Below is a listing of this years improvement project with a brief
description of the proposed improvements. The improvements can be
discussed in more detail at the Improvement Hearing which is scheduled
for 7:02 p.m., March 05, 2012, at the Willmar Municipal Utilities
building.
Reconstruction (0.83 miles)
Oak Lane NW 7th Street NW to the east Year Built: 1958
Reconstruction: Remove bituminous, remove & replace curb and gutter as
needed, replace water main, replace sanitary sewer, reconnect service
lines, grading, gravel base, remove & replace sidewalk as needed, remove
& replace concrete driveways as needed, turf establishment and
bituminous paving.
Russell Street NW Ella Ave NW to Olaf Ave NW Year Built: 1957
Reconstruction: Remove bituminous, replace water main, replace sanitary
sewer, reconnect service lines, storm sewer improvements, remove &
replace curb and gutter, remove & replace sidewalk as needed, update
curb ramps to include truncated domes, remove & replace concrete
driveways as needed, grading, gravel base, turf establishment, and
bituminous paving.
14th Street SW Grace Avenue SW to Willmar Avenue SW Year Built: 1963
Reconstruction: Remove bituminous, replace water main, replace sanitary
sewer, reconnect service lines, storm sewer improvements, remove &
replace curb and gutter as needed, remove & replace sidewalk as needed,
remove & replace concrete driveways as needed, grading, gravel base,
turf establishment, and bituminous paving.
Bernard St SE Becker Ave SE to Litchfield Ave SE Year Built: 1937
Reconstruction: Remove bituminous, replace water main, replace sanitary
sewer, reconnect service lines, remove & replace curb and gutter, remove
& replace sidewalk as needed, remove & replace concrete driveways as
needed, grading, gravel base, turf establishment, and bituminous paving.
Elizabeth Avenue SE Robert Street SE to 14th Street SE Year Built:
1986
Reconstruction: Remove bituminous, replace water main, replace sanitary
sewer, reconnect service lines, remove & replace curb and gutter as
needed, remove & replace sidewalk as needed, remove & replace concrete
driveways as needed, grading, gravel base, turf establishment and
bituminous paving.
Roise Ave SW 1st St S to 4th St SW Year Built: 1987
Reconstruction: Remove bituminous, remove & replace curb and gutter as
needed, remove & replace sidewalk as needed, remove & replace concrete
driveways as needed, grading, gravel base, turf establishment and
bituminous/concrete paving.
Overlay (0.84 miles)
5th Street SW Willmar Avenue SW to Kandiyohi Avenue SW Year
Reconstructed: 1993
Mill and Overlay: Mill bituminous 1 ½, correct damaged areas, pave 1 ½
of bituminous, remove & replace sidewalk as needed, update curb ramps to
include truncated domes, replace concrete driveways as needed.
9th Street SW Willmar Avenue SW to 19th Avenue SW Year Built: 1963,
1967
Mill and Overlay: Mill bituminous 1 ½, add catch basin, remove &
replace curb and gutter as needed, pave 1 ½ of bituminous, remove &
replace sidewalk as needed, update curb ramps to include truncated
domes, replace concrete driveways as needed.
New Construction
Willmar Avenue SW Industrial Drive SW (TH 40) to 22nd Street SW
New Construction: Remove bituminous off existing Industrial Dr. from
200' east of Co Rd 5 to old Willmar Ave intersection. New alignment,
common excavation, storm sewer, gravel base, curb and gutter, RR quiet
zone crossing, bituminous paving, and 8 bituminous path (22nd St to Co
Rd 5).
Miscellaneous
1st Street Bridge - Deck Rehabilitation
Storm Water Improvements
Crack Sealing
Seal Coat
Path - Along 22nd Street SW from 15th Ave to Willmar Ave
Sidewalk - Along 24th Avenue SE from 1st St to 550 east
Path - Along Willmar Ave from 22nd Street SW to CR5 (1,785)
|